(Click to enlarge image)
The Track Lifter can lift track up to 12 inches, creating a new sub-ballast layer and establishing a more permeable ballast and overall stronger structure. Additionally, it operates at higher speeds than traditional machines (up to 4 mph) and reduces the amount of tamper equipment required. These machines also offer lifter set-up/teardown time of 2 minutes, track lift up to 12 inches per pass, lifts track from formation to near finished height in one pass, eliminates multiple lifts with tamper, capable of operating in 16 deg. curves, track alignment tolerances +/- 2 inches, set-up time is 5 minutes, operation speed is unaffected by jointed rail or welded joints, can operate as part of a ballast train or independently, and capable of pulling up to 4 fully loaded 120 ton ballast cars.
No reviews yet.
Let users know what you would have wanted to know about this company.